Chandrayaan-2 Moon Mission Launch Countdown Remains Smooth: ISRO

Chandrayaan-2 Moon Mission Launch Countdown Remains Smooth: ISRO

The countdown for Monday’s Rs. 978 crore Chandrayaan-2 mission launch that started at 6:43pm on Sunday is progressing smoothly, the Indian Space Research Organisation (ISRO) said.

The rocket and spacecraft’s systems will undergo checks and fueling during the countdown.

The rocket is scheduled to lift off at 2:43pm later.

According to ISRO, fueling of the second stage/engine with unsymmetrical dimethylhydrazine (UDMH) and nitrogen tetroxide (N2O4) has been completed.

The GSLV-Mk III rocket with Chandrayaan-2 spacecraft was originally scheduled for flight at 2:51am on July 15. However, the flight was postponed after a technical snag was detected an hour prior to the rocket lift-off.

The ISRO later rectified the fault in its 44-metre Geosynchronous Satellite Launch Vehicle-Mark III (GSLV-Mk III). Weighing about 640-tonne, the GSLV-Mk III rocket is nicknamed ‘Bahubali’ after the hero of a successful film of the same name.

Just like the protagonist of the film lifted a heavy Lingam in one of its scenes, the rocket will carry the 3.8-tonne Chandrayaan-2 spacecraft.

About 16-minutes into its flight, the Rs. 375-crore GSLV-Mk III rocket is expected to sling the Rs. 603-crore Chandrayaan-2 into its 170×39,120-km orbit.

ISRO has sent up three GSLV-Mk III rockets so far. The first carried Crew Module Atmospheric Re-entry Experiment in December 2014. The second and third GSLV-Mk III carried communication satellites GSAT-19 and GSAT-29 in February 2017 and November 2018 respectively.

GSLV-Mk III will also be used for India’s manned space mission in 2022.

For the latest tech news and reviews, follow Gadgets 360 on Twitter, Facebook, and subscribe to our YouTube channel.

Reliance Jio to Focus on Subscriber Numbers Not Tariffs

Published at Mon, 22 Jul 2019 04:42:15 +0000

Leave a Reply